PRIMARY SURVEILLANCE RADAR OPERATION AND MAINTENANCE COURSE


 

OBJECTIVE:

 

To provide sufficient theoretical and practical knowledge to Radar Engineers  so that they could be able  

 

·     To operate the primary radar TA-10K within prescribed tolerances;

·     To identify front panel indications, controls, alarms, indications and meter readings and analyze operating performance of the system;

·     To identify/ isolate specific problems in case of system un-serviceability;

·     To replace defective unit and restore operation of PSR within minimum breakdown time; and

·     To implement recommended preventive maintenance procedure.

 

 

 

ELIGIBILITY:

 

·     Must be B.E (Electronics) and have completed Airport Electronics Engineering course; or

·     A Technical Officer of PG-8/PG-7 having a maintenance experience of at least 3/5 years on Nav-aids/Telecommunication equipment

 

 

DURATION:   8 WEEKS

 

SUBJECTS:

 

·     Introduction to radar system

·     Primary radar equipment TA-10K

·     Primary radar operating procedures

·     Preventive maintenance procedures

 

 


© Pakistan Civil Aviation Authority.